FLOOR AND STAIRS
Building a new home, upgrading an existing ? Let Us Bring your inspiration to life
https://irp.cdn-website.com/d550f8be/files/uploaded/Alyssa-Estimate_EST133_2025-12-05.pdf
We custom build AND INSTALL stair system to fit perfectly in your home.
To match stairs to the floor, we use the same material for both, stain the stair treads to match the floor's color and finish for a seamless look, or choose a complementary material for a contrasting but cohesive effect. Matching the material and color creates a unified, flowing appearance, while a contrast can highlight the stairs as a design feature
Stair and flooring services for homeowners in Seattle, Bellevue, Redmond, Issaquah, Kirkland, Kent, Tacoma, Seatac and the surrounding areas.
Contact us today to schedule a consultation
STAIRS: Craft Your Floor and Tread Designs Together
Create transition from floor to stair, and stair to landing: all from the same place. Make your treads and flooring match through the same species and finish options, or give them complementary looks. We offer custom-made treads tailored to your specific dimensions and requirements.
Standard Square Nose
A Square Nose is the finished edge or trim piece applied to the front of a stair tread. Fabricating custom squared style stair noses that perfectly match your exact flooring.
Waterfall Nosings
Sleek, modern look with no overhang, Available in 1-inch angled or 90-providing a clean, minimalist finish. Perfect match to your floors.Crafted from any material
Cap Squarenose
Our custom-fabricated cap square noses seamlessly overlay existing overhangs, eliminating the need to cut off the original nosing. This is a practical solution for those looking to preserve their current stair structure.
Floor and Baseboards Installation
Scope of Work – Hardwood Flooring and Baseboard Installation
1. Site Preparation and Demolition
- Protect adjacent areas and existing finishes during construction. Move and temporarily relocate furniture as needed to provide access to the work areas.
- Remove existing carpet, padding, tack strips, and other existing flooring materials as applicable.
- Remove existing baseboards and trim as required.
- Collect, haul away, and dispose of demolition debris.
2. Subfloor Preparation
- Inspect the existing subfloor for damage, uneven surfaces, loose panels, and moisture-related issues.Clean and prepare the subfloor for hardwood installation.
- Secure loose subfloor panels using appropriate screws or fasteners.
- Perform minor leveling and surface adjustments as necessary.
- Verify subfloor moisture conditions and suitability for the selected hardwood flooring.
3. Hardwood Flooring Installation – Approximately 1,000 SF
- Install prefinished solid hardwood flooring throughout the designated areas.
- Install flooring using the nail-down method with supplemental flooring adhesive, following the flooring manufacturer's installation requirements.
- Apply approved wood flooring adhesive where required for additional support and stability.
- Maintain appropriate expansion gaps along walls and other fixed surfaces.
- Cut and fit hardwood planks around doorways, corners, closets, and other architectural features.
- Install appropriate flooring transitions at doorways and adjoining floor surfaces.
- Ensure proper alignment, consistent plank spacing, and professional finishing throughout the installation areas.
4. Baseboard Installation
- Baseboard Painting. ($1.5/sf ) Supply and install new baseboards throughout the designated flooring areas, using the profile and dimensions approved by the Client.
- Measure, cut, miter, and securely fasten baseboards to the walls.
- Install baseboards around corners, door openings, and other architectural features.
- Fill nail holes and caulk joints and gaps where appropriate.
- Prepare baseboards for painting.
- Prime and paint new baseboards with the Client-approved color and finish, if included in the contract.
5. Final Inspection and Cleanup
- Inspect installed hardwood flooring and baseboard for proper fastening, alignment, and visible installation defects.
- Remove construction debris and clean the work areas.
- Perform final touch-ups related to the installation.
- Complete a final walkthrough with the Client.
-
Notes and Exclusions
- Hardwood flooring material will be selected and purchased by the Client unless otherwise specified.
- Baseboard materials, adhesive, fasteners, and other installation supplies will be provided as specified in the contract.
- Major subfloor repairs, structural modifications, extensive leveling, and moisture remediation are excluded unless separately approved.
- Painting of walls, doors, and other existing surfaces is excluded.
- Staircase installation is excluded unless specifically included in the contract.
- Any additional work discovered during demolition or subfloor inspection will be discussed with the Client and requires approval before proceeding.
Our Process
Communication
The initial process begins with a consultation. We listen to your ideas and create a vision that will be aimed toward your architectural style and budget.
Design
If design services are included in the quote, we determine the parameters of your space and finalize material selection. Measurements are taken and a CAD drawing from these measurements will be produced with all the details needed for manufacturing to begin on your customized staircase.
Manufacturing
Our skilled craftsman guide the manufacturing process by taking all of the final design elements and making them come together to create your perfect staircase.
Delivery and Installation
We deliver and installs staircases and railing structures.























