CLIENT ZONE
Project
Client Name: Chris
Location: Renton, WA
Scope of Work: Kitchen Remodel, Bathroom 1 Remodel, Bathroom 2 Remodel, Bathroom 3 Remodel
Kitchen Remodel
Scope of Work
Demolition
- Remove existing kitchen cabinets and countertops, backsplash
- Remove vanities and countertops, backsplash
- Protect adjacent areas from dust and debris.
- Remove All appliances, will be reused, put aside.
- Remove and dispose of all demolition materials and construction debris at an approved dump.
Cost: $1850
-----------------------------------
Cabinets:
Cabinets Material: Shaker Cabinets, Wood , All wood construction (15 cabinets)
- Includes Assembling, Delivery
Cost: $5100
---------------------------------------------
Kitchen Cabinets Installation
Includes: Cabinets Installation, Molding on the Top of Cabinets (H=3") Installation. Toe-Kick Installation, Island Finishing with panels. Handles Installation
Faucet Installation.
Cost: $ 1800
--------------------------------------------
Countertop:
Includes: Material: Quartz. Delivery, Cutting Holes for sink and Faucet, Installing on Plywood. Installing 3" Backsplash from the quartz. Installing Sink (undermount)
Cost: $3400
---------------------------------------
Appliances Installation:
Install dishwasher, Install microwave/hood, Install fridge, Install stove.
Install Faucet
Cost: $ 400
----------------------------------------------------------------
Subtotal before tax
Demolition & disposal: $1850
Kitchen Cabinets $5100
Countertop (with installation) $3400
Kitchen Faucet: Brand: KRAUS: $150
Kitchen Handles (25) : $150
Kitchen Cabinets Installation: $1800
Facet, Appliances Installation : $ 450
--------------------------------------
Total: $12,900
Bathroom 1 Remodel
Demolition all 3 bathrooms
- Remove existing vanity cabinets and countertops, backsplash
- Protect adjacent areas from dust and debris.
- Prepare area for new vanity installation
Remove and dispose of all demolition materials and construction debris at an approved dump.BATHROOM 1
BATHROOM 1, VANITY with double sink
-----------------------------------
Bathroom 1
Fix the hole in the wall where the old backsplash was removed, put new drywall, Patch the wall and prepare for the new backsplash
Plumbing access, leveling
Fix Existing Mirror - attach it to the wall
Install Vanity Cabinet - Width 59 ". 1 sink, 1 faucet
Install Vanity Quarts Countertop, Install 3" backsplash, Install faucet, drain, connecting water/drain lines
----------------------------------------------------------------
Subtotal before tax
Vanity with Countertop :$ 1500
Faucet: $149
Labor and Rough materials: 500
--------------------------------------
Total: $2150
Bathroom 2 Remodel
----------------------------------
Bathroom 2
Install Tile on the floor - area: 5X7.5 feet - 40SF
Fix the hole in the wall where the old backsplash was removed, put new drywall, Patch the wall and prepare for the new backsplash
Plumbing access, leveling
Install Vanity Cabinet - Width 59 ". 2 sinks,2 faucets
Put Vanity Quarts Countertop, Install H 3" backsplash, Install 2 faucets
----------------------------------------------------------------
Subtotal before tax
Tile Cost: 24X24, 40 SF - $200
Vanity with Countertop :$ 1500
Faucets: - quantity 2, $300
Labor and Rough materials : $1620
--------------------------------------
Total: $3600
Bathroom 3 Remodel
Bathroom 3
Fix the hole in the wall where the old backsplash and shelf was removed, put new drywall, Patch the wall , texture, paint area under the mirror
Plumbing access, leveling
Install Vanity Cabinet - Width 30 ". 1 sink, 1 faucet
Install faucet
----------------------------------------------------------------
Subtotal before tax
Vanity with Countertop :$ 450
Faucet: - $79
Labor and Rough Material : $ 500
--------------------------------------
Total: $1,029
Cleaning: $150